Customization: | Available |
---|---|
After-sales Service: | on Site Training |
Warranty: | 1year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ZYC360 Pile Foundation Equipment For PHC Concrete Pile With Rapid Pressing Speed
T-works is professional manufacturer for foundation & piling machinery with over ten years experiences.We have a large group of advanced people for R& D and after-sale service.We have exported over 500units of piling machinery abroad,such as Singapore,Malaysia,Indonesia,Brunei,Ukraine ,Bangladesh, West Europe and so on.Our company follows the motto"Modesty,Sincerity and to be Excellent" and we are willing to serve all our customer and be good friends of them.
ZYC series hydraulic static pile driver is a new environmentally friendly pile foundation construction equipment with a number of national patents. It has the features of no pollution, no noise, no vibration, and fast pile driving, high quality pile. The static pile driver can drive the precast concrete pile from 150mm to 650mm for square pile, 300mm to 800mm for round pile. It also can push the tube, triangle pile, H-pile, etc by changing its jaws inside of the clamping box.
Parameter/Model | ZYC360 | |
---|---|---|
Rate piling pressure(KN) | 3600 | |
Piling speed(m/min) | Fast | 7.1 |
Low | 1.9 | |
Piling stroke(m) | 1.9 | |
Pace(m) | Longitudinal | 3.6 |
Horizontal | 0.7 | |
Angle range(°) | 11 | |
Rise stroke(m) | 1.1 | |
Square pile(mm) | Max | 500 |
Circle pile(mm) | Max | 600 |
Side piling(mm) | 1250 | |
Corner piling space(mm) | 2500 | |
Lifting weight(t) | 12 | |
Pile hanging length(m) | 14 | |
Power(KW) | Piling | 74 |
Lifting | 30 | |
Main dimension(m) | Work length | 12.7 |
Work width | 7.1 | |
Transpot height | 3.15 | |
Total weight(t) | 360 |
1) Minimum order: 1 unit.
2) Valid period: 15days.
3) Package: Nude package.
4) Payment: 30% of total contract price by TT as deposit, balance amount of total contract price by TT upon inspection before delivery to China sea port for export.
5) Delivery: Approximated 35 days ready for inspection at China factory from the day of receiving the deposit in full amount.