Customization: | Available |
---|---|
After-sales Service: | on Site Training |
Warranty: | 1year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. What is the machine doing?
Our cutting-edge static pile driver employs its own substantial weight to execute pile driving tasks with incredible precision and efficiency. For example, the ZYC120 model weighs an impressive 120 tons, exerting a formidable force of 1200KN during the pile jacking-in process. This versatile machine can effortlessly drive PHC piles of any shape without generating noise or vibration. Additionally, it can handle steel tubes, triangle piles, sheet piles, and more, with pile sizes ranging from 150mm to a remarkable 1000mm.
2. Where can it be used?
Perfectly engineered for urban environments, particularly along coastlines, this machine is a game-changer for civil construction sites. If you're weary of incessant complaints from authorities and citizens about noise, pollution, or vibrations caused by traditional hammers, our static pile driver is your ideal solution. With its whisper-quiet operation, zero emissions, and precise hydraulic control, this machine is perfectly suited for urban piling projects.
3. How does it work and move?
The static pile driver seamlessly presses piles into place using an embracing clamping box controlled by an advanced hydraulic system, enabling rapid progress of up to 600 meters per day. Its movement is equally sophisticated, featuring a hydraulic-driven mechanism known as short boat and long boat step walking, ensuring unparalleled stability and resistance to sinking.
4. Our advantages:
1) With over a decade of experience in manufacturing static pile drivers, we possess unparalleled expertise in R&D.
2) Boasting over 20 patents, our design innovations set the benchmark for excellence.
3) Global reach with more than 600 units exported worldwide.
4) Comprehensive after-sales service available worldwide to ensure customer satisfaction.
5) We utilize meticulously controlled, high-quality spare parts to guarantee superior machine performance.
6) As the sole manufacturer dedicated to producing static pile drivers in China, we deliver unmatched attention to quality.
7) Our machines boast a piling capacity ranging from 60 to 1200 tons, accommodating square piles from 150mm to 650mm and round piles from 300mm to 800mm.
5. Applications: CIdeal for clay, soft soil, and sand layers;
Perfect for noise-regulated urban areas and vibration-sensitive zones,
Such as proximity to historical buildings, precision facilities, subways, and overpasses.
Moreover, we offer bespoke designs to meet specific customer requirements.
6. Unique design:
1) Clamping box:
2) Roller and clamps:
3) Diverse options for side mechanisms:
4) Special design for cylinder of leg
5) Intelligent hydraulic system distribution
6) Optimized crane design for enhanced performance
7. Technical Parameters:
paramete / type | ZYC700 | |
rated piling pressure(KN) | 7000 | |
piling speed(m/min) | fast | 7 |
low | 1.4 | |
piling stroke(m) | 1.9 | |
pace(m) | longitudinal | 3.6 |
horizontal | 0.7 | |
angle range(°) | 11 | |
rise stroke (m) | 1.2 | |
square pile(mm) | max | 550/600 |
cirle pile(mm) | max | Φ600 /Φ800 |
side piling space(mm) | 1250 | |
cirle piling space(mm) | 2500 | |
lifting weight(t) | 16 | |
lifting pile's lengh(m) | 15 | |
power(KW) | piling | 111 |
lifting | 30 | |
main dimension(m) | lenth of work | 14 |
width of work | 8.16 | |
transprorting height | 3.15 | |
total weight(T)≥ | 700 |
1) Minimum order: 1 unit.
2) Validity period: 15 days.
3) Packaging: Delivered in a secure nude package.
4) Payment: 30% of the total contract price as a deposit via TT, with the remaining balance payable by TT prior to inspection and delivery to the China sea port for export.
5) Delivery: Ready for inspection approximately 20 days after the full deposit is received at our China factory.
We provide comprehensive training for operators, maintenance personnel, and construction teams to ensure optimal machine utilization.
♣ We offer a robust guarantee: 1 year for the Main Machine and 6 months for accessories. During this period, confirmed manufacturing defects will be rectified at no cost. Post-guarantee, we continue to provide repair services, charging only for repair costs.